Weight of the cable is \"\" lb/ft.

\

Weight of the coal is \"\" lb.

\

Depth of the mine is \"\" ft.

\

Force exerted by the cable to lift it by \"\" ft is \"\" lb. Find the work done needed to lift.the cable to 500 ft.

\

Therefore, \"\".

\

Work done as a Riemann sum is  \"\".

\

\"\"

\

\"\".

\

\"\" lb-ft.

\

Work done required to lift the cable is \"\" lb-ft.

\

\"\"

\

Find the work done needed to lift.the cable to 500 ft.

\

Work done formula:

\

\"\".

\

Substitute \"\" and \"\" in above expression.

\

\"\" 

\

\"\" lb-ft.

\

Work done required to lift the coal is \"\" lb-ft.

\

Total work done is sum of the work done needed to lift cable and work done needed to lift the coal.

\

\"\".

\

Substitute \"\" and \"\" in above expression.

\

\"\"

\

\"\".

\

Work done required is \"\" lb-ft. 

\

\"\"

\

Work done required is \"\" lb-ft.