\"\"

\

Weight of the bucket is \"\" kg.

\

Height is \"\" m.

\

Initially bucket contains \"\" kg of water.

\

Weight of the rope is \"\" kg/m.

\

At any point of distance \"\":

\

Mass of the rope is \"\" kg.

\

36 kg of water finishes draining at 12 m level.

\

Therefore, rate of draining is \"\" kg/m.

\

Mass of the water is \"\" kg.

\

Mass of the bucket is \"\" kg.

\

Total mass is \"\".

\

Substitute corresponding values in above expression.

\

\"\"

\

Force \"\".

\

\"\" m/s2.

\

Substitute \"\" and \"\" in \"\".

\

\"\".

\

\"\"

\

Find the work done required to lift the bucket to 12m level from the ground.

\

Work done as a Riemann sum is  \"\".

\

\"\"

\

\"\"

\

\"\" J.

\

\"\"

\

Work done required to lift the bucket to 12m level from the ground is \"\" J.